Throughout production process, we pay great attention to quality control; therefore, each new equipment project is developed in several stages.
- The production drawings prepared by LATMAS designers are inspected by the LATMAS technical team.
- After approval of the drawings, the new equipment is assembled to test the operation of all units; if necessary, adjustments are made to the drawings.
- After these tests, the new equipment is installed and prepared for connection to the control system – all programs are prepared and tested, and only then the equipment is delivered to the customer.